Talk:GEOS-Chem Near-Real-Time Simulations

From Geos-chem
Revision as of 20:03, 7 August 2008 by Bmy (talk | contribs)
Jump to navigation Jump to search

This page is reserved for questions pertaining to the GEOS-Chem Near-Real-Time simulations.

07-Aug-2008

The NRT is running normally; met data 2 days behind real-time and G-C simulations 3 days behind real-time. NOTE: Bob Yantosca (the operator) will be on vacation from 8/11 until 9/2. Also the GEOS-5 met fields may switch over from v5.1.0 to v5.2.0 while Bob is on vacation. This may cause the NRT to stop.

--Bob Y. 16:03, 7 August 2008 (EDT)